1st WTP General

Upgrade of Existing Buraydah Main WTP (1) Replacement of 4 Trains

 

As per tender specifications a direct replacement of existing UF system is focused. The existing plant equipment as UF building, civil works, pumps, pipes and instrumentation need to be used. The new ceramic membrane system needs to be finally connected to existing PLC and SCADA system with required modification.

  • Implementation of CFM Systems into existing UF trains.
  • Implementation of sludge slope inside filtration tank.
  • Implementation sprinkler system.
  • Installation of CFM Systems Filtration Racks.
  • Filtration equipment.
  • Central backwash unit.
  • Chemical circulation unit.
  • Sprinkler unit.
  • Blower unit.

Connection with existing PLC and SCADA.

Key Benefits

The core target of the pre-treatment is the forming of suspended Fe and Mn compounds. Typically used pre-treatment steps are aeration followed by chemical oxidation. During aeration dissolved Fe compounds are oxidized. The subsequent chemical oxidation realizes a further oxidation of dissolved Fe and an oxidation of dissolved Mn compounds. Common used chemicals are therefore chlorine gas or NaOCl with the additional advantage of water disinfection. Depending on the ground water characteristic additional chemicals are required to realize an oxidation. The oxidation of Fe requires a pH value higher than 6.8. In case of lower pH values caustic solution or other pH increasing chemicals have to be dosed.

The oxidation process of Fe and Mn will be finished during passing of the detention tank.

After oxidation the coarse formed particles can be easily removed due to fast sedimentation. The non- settled micro particles will be removed due to filtration. The suspended solid free permeate (filtered water) of the filtration step will be pumped to the final treatment step – reverse osmosis (RO).